CASE STUDY:
Precision Drop-In Replacement
A failed wastewater aerator threatened major regulatory risk and costly downtime for Orange County Utilities. With a 24-week OEM lead time and no dimensional drawings, the pressure was on.
Download the full case study to see how SEW-EURODRIVE's precision 3D scanning, U.S.-based assembly, and full-scope support brought the system back online in just 14 weeks.
Download Case Study
Related Articles
SEW-EURODRIVE is Dropping the Ball… In the Best Way Possible
Behind the magic of the NYC New Year’s Eve Ball Drop Every year, as the final seconds tick away,…
External Lubrication Systems for Heavy Industry Gearing
SEW-EURODRIVE Offers External Lubrication Systems for Heavy Industry Gearing Now delivered in as…
SEW-EURODRIVE Now Offers GearOil by SEW-EURODRIVE in Heavy Industry Gear Units
Optimized Lubrication—Engineered by SEW-EURODRIVE, Now Available for Many Large Industrial Drive…